Saturday, April 7, 2012
Happy Anniversary Mustang!
Well just over a year ago with the help of some of my good friends, we stripped the Mustang down to a rolling shell with engine and wheels. In that year there have been a lot changes. It may be slow going, but the work is solid. Above are a few update photos as the body shop moves into the engine bay. In the past year the body shop has replaced the right rear quarter, full length floor pan, toe boards, both rocker panels, drivers side A pillar, radiator core support and has begun the epoxy primer coat. All pieces were replaced with original sheet metal where I could. More to come!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment